A Better Built Environment Through Measured Value
Richard Vermeulen, Chief Estimator | Lead Economist Blair Tennant, Director | Business Development
Agenda
■Value Process Concept Phase
■Value Process Design Phase
■Value Process Construction Stage
The Value Process: Concept Stage
Concept Stage
Master Plan Utilization
Program Estimating
Component Tracking
Benchmarking
Sketch & Narrative Design
Cost Models
Risk & Feasibility Studies
Design Stage
Milestone Cycles
Continuous Cost Control
Integrated Design
Optimization / Reconciliation
Life Cycle Analysis
Options Analysis
Value Process Rollup
Construction Stage
Bid Analysis
Databasing
Total Benefit Analysis
The concept stage offers the most flexibility in scope parameters at the least investment.
Tools that bring the most certainty and best value prior to the start of detailed design.
Master planning assesses existing programs and future needs, leading to a blend of new and renovated building programs.
Our tools, Program Estimation, Component Tracking, Benchmarking, Sketch, and Narrative Design inputs produce line-item Cost Models.
These roll up into a total concept package study that includes risk and feasibility assessments.
Master Plan Utilization

5 x 400,000sf projects 10 years?



52x 550,000sf projects 10 years
The concept shown was one of 27 done at the concept stage.
Master plan utilization identified both an existing building in need of re-use as well as programming opportunities.
This building functions 24/7 and is a student hub with new learning environments.
Utilization optimization brought the program from 5 projects to 2 over the anticipated 10-year horizon.
High-tech additions for high volume, custom structure, and public amenities. Low-tech renovations for lower floor-to-floor and building system requirements such as office space.
This example achieved a space-saving of 2 to 1.1M square feet and a price saving of 400 to 350$/sf. Other savings and benefits, such as 24/7 access, daylighting, collaboration, safety, and campus integration, add to the total benefit.
Later-phase engineering program requirements can be re-assessed after several years and could be quite different from initial program studies.
Space = $
What is the space?
Type: Classroom, lab, office, support, fit for these issues
Why does the space exist?
Program, mission of the institution, attributes, and condition
Where is the location and its operations?
Energy use, utilities, operations, updates, and environmental issues
How is the space used?
Regularly or sporadically, by students or community?
When is the space used?
Time of day, semester, other?
Program synergy and utilization are the focus of program studies that address the who, what, when, where, how, and why.
We add dollar values to these spaces so the team can assess the cost impact of program iterations in real-time.
Graphic Program Database and Analysis
Since 1984, we have provided area and program analysis.
This data gives us the information we provide to you, characterizing net programs, net-to-gross factors, and space planning relationships.
This example shows an unusual amount of circulation space and single-loaded corridors, which typically create problems projecting costs from the net program.
Program Estimating
Historically, net programs were grossed up to apply a $/sf value, which led to inaccurate program estimates.
Our approach is to identify primary program elements and price not only the scope of each space but also the necessary distribution and head-end requirements that support it. Further, we apply premium costs, such as custom air handlers, that apply across the board. This leads to $/sf values in excess of the base cost of the primary spaces but also leads to greater accuracy since low-cost spaces such as offices and storage spaces do not require these premiums.
When we look at grossing spaces at the bottom of the table, we use the reverse method, considering only the marginal cost to provide additional space over the net program. For instance, visualize a cube with no corridors, shafts, mep, etc., and figure only the additional enclosure. This approach eliminates errors from grossing factor unknowns and focuses attention on the program that drives cost.
Component Tracking
We track component costs clearly and concisely in column format. This provides separation for building types, such as new renovation, and gives better certainty.
We track component costs clearly and concisely in column format.
This provides separation for building types, such as new and renovation, and gives better certainty.
In this example, we were asked to track performance spaces for funding purposes as well as characterize where the principal costs lay.
Benchmarking and Target Values
Bottom-line values for projects such as performing arts centers can be compared.
Our Level 1 Elemental Estimate format also provides target values for standard design elements, which are useful for comparison and sub-consultant buy-in at the earliest stages.
Sketch and Narrative Design
Sketch Plans and narratives inform the comparison to design and bid data and calculate target values.
Similarly, we would track parking, retail, office, and residential separately.
As sketch plans and narratives become available we can access our database in order to benchmark comparable projects.
Line Item Cost Model — Iterative Process
These models read as estimates based on calculated (as opposed to measured) scope. This creates certainty as iterations are readily reviewed and refined to create a preferred concept.
As narratives and concepts become established, we are able to provide line-item cost models.
These models read as estimates based on calculated (as opposed to measured) scope. This creates certainty as iterations are readily reviewed and refined to create a preferred concept.
For example, if triple glazing is a design goal, the cost model confirms that it is carried from the outset.
Once the preferred concept, cost model, and budget are reconciled, the package provides a comprehensive record that can be referenced in subsequent design stages.
The Value Process: Design Stage
Concept Stage
Master Plan Utilization
Program Estimating
Component Tracking
Benchmarking
Sketch & Narrative Design
Cost Models
Risk & Feasibility Studies
Design Stage
Milestone Cycles
Continuous Cost Control
Integrated Design
Optimization / Reconciliation
Life Cycle Analysis
Options Analysis
Value Process Rollup
Construction Stage
Bid Analysis
Databasing
Once we proceed into design a more formal and less fluid process is required.
Design stages are marked by milestones but also contain continuous feedback as required.
Optimization and reconciliation sessions happen in real-time and are documented and rolled up into easy-to-navigate records.
Value and Benefit, as well as parallel estimate processes, are performed in an integrated process.
Milestone Cycles & Continuous Control
Vision
Mission
Values
Milestone Estimating Cycles™
Final
Analysis
Milestone Estimating Cycles™
At every significant project milestone, from Preliminary Design through to Contract Documents, we perform another iteration of Milestone Estimating Cycles. The 6 steps in this tested and proven cycle enable us to provide the most detailed and accurate estimates for our clients. Each Milestone Estimating Cycle includes:
1. Milestone kickoff: Sets the schedule, parameters, and components.
2. Graphic analysis: Confirms components and area basis.
3. Elemental estimate draft: Estimating creates a draft.
4. Review and reconciliation: This process confirms the draft and compares it to the budget, previous estimates, and parallel estimates.
5. Value optimization: Back on budget incorporates clarification of design intent, owner feedback, and value optimization.
6. Milestone estimate: Includes reconciled estimate, value process roll-up, and cost-benefit analysis.
Integrated Design and Parallel Estimating
Independently prepare draft estimates → Exchange and identify opportunities → Review and establish milestone estimate
Parallel estimates are the norm for integrated design.
They provide:
- Independent quantification and pricing based on bid data and market feedback
- Commitment of Prime Consultant and Owner to an agreed budget
- Cross-check of quantities and scope
- Reconciliation to budget and prior estimates
- Value optimization opportunities resulting from line item comparison
- Integrated and lean process support
- Orderly and focused time management
Reconciliation and Optimization
![]()
![]()
![]()
Line item target values and optimization opportunities are tracked in real time for continuous control
![]()
![]()
![]()
Detailed line-item estimates and the reconciliation process help provide an integrated Value Optimization effort. Discrepancies with client budgets are generally due to a variance in the assumption of scope or quality.
A Reconciliation list is prepared from these variances and line item details in order to highlight areas of potential optimization and further investigation. Items requiring further investigation and owner approval are typically listed separately.
The milestone process reduces the need for redesign, keeping projects off the redesign treadmill. The typical savings/optimization are 20% at SD, 10% at DD, and 5% at CD.
Reconciliation and Validation
The case study reconciliation process identified scope and pricing deltas primarily in MEP trades.
The local market was busy, and a short list of subcontractors led to very high quotes.
The construction manager attracted other players to the table and confirmed rates closer to bid averages.
Eventually, buying just below budget came due to improved market conditions.
Total Benefit Analysis — Live Cycle Cost Analysis
Typical optimization, such as lighting and power density, save up front and over time.
Benefits, such as daylight sensors, are priced and evaluated for payback.
Total Benefit — Option Analysis
Total Cost of Ownership Over Building Life Cycle
Complex building system integration is captured in a detailed option analysis. Multiple design inputs, cost factors, and benefits are documented.
Value Process Rollup
Base Scheme $
362M Draft Estimate
354M Reconciled Estimate
Value Process Item Totals
–8M Reconciliation
–13M Alternates and Sustainability
–56M Optimization
300M
Budget
Target
Standard milestone estimate documentation.
Most optimization ideas come out of the integrated process through line item scrutiny and documentation of ideas, forming optimization opportunities.
The Value Process: Construction Stage
Concept Stage
Master Plan Utilization
Program Estimating
Component Tracking
Benchmarking
Sketch & Narrative Design
Cost Models
Risk & Feasibility Studies
Design Stage
Milestone Cycles
Continuous Cost Control
Integrated Design
Optimization / Reconciliation
Life Cycle Analysis
Options Analysis
Value Process Rollup
Construction Stage
Bid Analysis
Databasing
Total Benefit Analysis
4,000 Projects
$200 Billion
• Bids
— VCE Index
— Construction Trendline (3.5%)
— CPI Trendline (2.5%)


Since 1986, we have tracked project bid prices represented by dots. Since 2006, we have made this information available to our clients with our Market Outlook.
We bring these projects forward or back in time, as well as adjusting for location and procurement, in order to benchmark comparable projects.
Our current database of over 3,900 projects forms a library for accessing market conditions, trade prices, escalation, building type, client contracts, product information, and correspondence that can be extrapolated to your project.
Vermeulens index is the only normalized empirical data set of construction project prices. Other project data sets depend on opinion-based interpretation between locations, building type, bid conditions, procurement approach, size, complexity, and program. Other data sets are based on input prices such as material and labor; while these are empirical, they lack normalization for the above parameters, as well as contractor markups for overhead and profit.
The Value Process and Total Benefit Analysis


The Energy Pie


Two-thirds of our Energy Consumption is a Direct Result of the Built Environment.
As Construction Economists, We are Responsible
Buildings and transportation infrastructure are key to controlling energy consumption.
Construction economics and the design community are responsible for finding and implementing the path forward.
If it Costs More, is it Sustainable?


The Value Process takes design and economic elements apart, examines them, identifies optimal pieces, and places these pieces in optimal relations.
A checklist approach fails as it prioritizes a score, frequently costs more upfront, and fails to save over time.